490
Bed Facility
2015
Completion Year
$9.5
Million
Project Value
Almaryah04

The Project

The clinic is a 364 (expandable to 490) bed facility and is a unique and unparalleled extension of the Cleveland Clinic model of care. The project was to manage the delivery of the on-site hospital catering facilities. The facility serves multiple areas of the hospital from VIP and Royal Suites, and Conferencing Centres. The facility accommodates live cooking demonstrations and is available to staff and visitor areas. The programme was carried out within one year and was delivered alongside the main programme of the medical facility. The facility was required to accommodate multiple meals of varying cuisines on a continual and daily basis to satisfy the requirements of the clinic.

D0d6321d 41Cc 44E5 A881 Bd197555cc6d

Our Appointment

Following initial inspections by Abu Dhabi Food Control Authority (ADFCA), we were engaged in a direct hospital operator appointment to scrutinize the design and analyze the as-built conditions. The ultimate objective was to ensure the catering facilities obtain ADFCA approval. MEP and Fire and Life Safety related issues were also identified, revised accordingly and implemented to guarantee the necessary approvals. The kitchen required an industrial fit out to accommodate the significant output required by the clinic; additionally, the layout and design required impeccable operational efficiency to account for seamless flow and sanitation requirements in line with any food and beverage establishment.

Cleveland Clinic 3

The Benefit

Our delivery of catering facilities and industrial kitchens in the hospitality sector, coupled with our extensive healthcare project management practice enabled us to deliver the required first-rate facility for our client. Through our detailed review and understanding of Abu Dhabi Food Control Authority ADFCA, ADCD and ADDC requirements, we were able to identify key areas requiring a revised scheme to satisfy the governing bodies. These corrective measures allowed for the project to be completed within the allotted timeline, in accordance with the approved budget and exceeding the standards and expectations of not only the governing body, but the Hospital Operator and Stakeholders.

Do you have a similar project?

Get in touch with the PM today!
Get in touch