The Project
The project was a design and build construction of a new 20,000 square meter, climatecontrolled warehouse and a G+2 executive office block located at Dubai South. The warehouse facility included a 20 meter-high narrow aisle racking which added 45,000 pallet spaces to GAC Dubai’s operational capacity. The mezzanine floors of the warehouse were fitted out as office space, workers facilities and a re packaging facility. This project was the new additional to one of several locations of GAC, so this project had to match in terms of design and style its other structures, while being operationally suited to its purpose.