90
Tee Lines
240
Space Car Park
7,500
Size
DSC02835

The Project

Topgolf comprises of a 7,500 sqm G+2 arc-shaped building, located next to the European Tour Majlis course, and has over 90 tee-lines, VIP suites, a management office, storage rooms, changing rooms, kitchens, cold rooms, a sports bar with a garden terrace, a restaurant overlooking the live entertainment, conference facilities and private golf suites. The project included a new 750m roadway, landscaping, a 240-space car park. The teeline technology made up of multiple gaming screens, Toptracer cameras, outfield lighting and ball dispensers added a degree of complexity which required close coordination. 

DGP 6283

Our Appointment

PMK (formerly 3Sixty) provided site-based lead consultancy representation and Resident Engineering (RE) services through our partners ASG. Multiple disciplines were deployed under the lead consultant, which included building architecture, interior design, structural and civil engineering, landscape architecture, fire & life safety, infrastructure, planning, cost control, MEP engineering and AOR services. PMK were tasked with managing all consultancy disciplines while providing RE duties overseeing the contractor’s activities, maintaining quality through compliance with design, statutory authorities (such as Dubai Green Building Regulations, Operator and Franchiser brand standards and other operational requirements).

Whatsapp Image 2021 02 02 At 9.49.15 AM (2)

The Benefit

With a background in delivering highly technical, complex and challenging projects, PMK have demonstrated our ability to identify and mitigate risks, while nurturing cohesion within the project 
team. While the project experienced challenges with procurement (due to the Covid-19 pandemic) and site constraints, these were overcome due to PMK’s intervention. Potential delay events were mitigated and managed to limit the client’s exposure to cost and time implications. PMK gained great knowledge and expertise of Topgolf’s teeline and outfield technology, and operational requirements specified by the USA team. Our ability to help ensure seamless integration of media and broadcast delivery, and to coordinate international stakeholders added significant value. Finally our ability to navigate the approvals process successfully enabled quicker turnaround times while works on site could progress in earnest. 

Do you have a similar project?

Get in touch with the PM today!
Get in touch